Project

Project: Jupiter at University
Type: Jupiter 50AG, 3-chamber
Country: Malaysia
Client: University of Kualur Lumpur
Capacity: 50 m³/day
Year of Installation: 2009.

Description

The Jupiter system is installed above ground.

You can see the steel bars needed to take the water pressure. If the system is installed in-ground, the pressure is taken by the surrounding soil.

You can also the aerated chamber and the following settling zone.