Project
Project: Jupiter at University
Type: Jupiter 50 AG, 3-chamber
Country: Malaysia
Client: University of Kualur Lumpur
Capacity: 50 m³/day
Year of Installation: 2009
Quotation: Q-0039
Description
The Jupiter system is installed above ground.
You can see the steel bars needed to take the water pressure. If the system is installed in-ground, the pressure is taken by the surrounding soil.
You can also the aerated chamber and the following settling zone in each of the three treatment chambers.
See video of the system in operation.