Project

Project: BioReactor for olympic village
Type: 3 x Bioreactor 250-chamber
Country: Bolivia
Client: City of Cochabamba, Bolivia
Capacity: 500 m³/day / 3.500 PE
Year of Installation: 2018
Quotation: Q-1818

Description.

The BioReactor system was ordered for the Olympic City for the South American Games in 2018.
The blowers were upgraded for use at high altitude (2.600 m).

The time was short. The system was ordered in October.
Built at BioKubes factory in Czech Republic, shipped via Panama Canal to Peru.
Driven up to the mountains in Bolivia and in operation in May.

See her video of construction work.