Biokube Saturn systems
1,000 – 10,000 PE
BioKube Saturn systems are installed above ground.
In Saturn systems, the focus is on reducing initial cost of civil works.
Video of 12 Bioreactors installed in Poland
Saturn system in Australia
System under installation in 2017.
System installed at a small city
Saturn system in Holland.
System installed at a Biogas plant in 2015.
It was decommissioned in 2017
Saturn system in Holland.
System installed at a Biogas plant in 2015.
The picture shows the “dry run” test of the system at BioKube factory.
Saturn system in Australia
System finished installation in 2018.
System installed at a small city
Saturn system in Holland.
System installed at a Biogas plant in 2015.
The picture shows the “dry run” test of the system at BioKube factory.
In the picture you can see, that there is one central blower used for the complete system.
Why choose BioKube?
BioKube Saturn are installed above ground
Installation above ground keeps cost of ground work at a minimum
BioKube Saturn are BioKubes biggest units
If the requirements are standard European of BOD < 25, then the biggest Saturn units will each will treat wastewater from 750 PE