BioKube BioReactor (500 – 5,000 PE)

BioReactor systems are installed in on-site built concrete tanks.

The main advantages of this are that the use of local labor is maximized as opposed to a system being delivered completely finished to the end site.

Also this means that cost of transportation is reduced since only the active cleaning units are shipped and not the settling zones. These are part of the concrete tank.

SEE VIDEO of BioReactor under installation at oil camp in Yemen
12 BioReactor systems installed at vegetable factory in Poland. The BioReactor units are mounted in on-site built concrete tanks

12 x BioReactor 150 in Poland

The system from 2007 is installed at a vegetable factory.

The system is a 3-step solution. In the picture you see the 4 BioReactor units in the first step. You also see, that there after the treatment units, there is a settling zone as part of the concrete tank.

BioKube BioReactor systems in new city development in Bolivia

BioReactor in Bolivia

The picture shows a BioReactor for a city in Bolivia. The system was installed in 2018.

The system is completely covered by an aluminum lid

BioKube BioReactor 150 module

BioReactor 150 unit

The picture shows a BioReactor i50 unit ready for shipment at BioKube factory.

BioKube BioReactor systems under installation at oil camp in Yemen

BioReactor in Yemen

The picture shows a BioReactor system under installation at an oil camp in 2009

You see the BioReactor unit being lowered into the previously built concrete tank.

BioKube BioReactor systems under installation in Zimbabwe. The system is built next to a golf corse and the treated water will be used for watering greens and fairways

BioReactor in Zimbabwe

The picture shows a BioReactor being installed next to a golf course. You can see 13th hole in the picture
The system was installed in 2019

One of the reasons for buying the BioKube system is that there was not enough water for the golf course. Now the treated water will be used to water the golf course.

BioKube BioReactor system installed at new sporting complex in Bolivia

BioReactor 150 in Bolivia.

The picture shows a new sports complex in Bolivia.

The opening of the sports complex was set for April 2018. BioKube got the order in Ocktober 2017. The system was ready for the opening in April 2018.

So, from October 2017 till April 2018 BioKube
– Manufactured the system at our factory in Europe
– sent in by container ship to Chile
– drove it into the mountains in Bolivia
– performed installation and startup.
And all in only 7 months.

Why choose BioKube?
N

Large system delivered plug and play

BioReactor systems are delivered complete with all parts to be installed in on-site built concrete tanks

N

Save costs - use local labor

With BioReactor systems you only buy the active cleaning chamber. The rest of the construction is performed by local labor

Click on image to go to Biokube Technical Library for download of all documents