Plug and Play intallations

1. Square design of treatment unit secures simplest possible and cheapest civil works (less concrete needed)

2. Standardized engineering and drawings to ease hassle and minimize the risk of expensive unforeseen issues

3. All concrete work can be complete before the BioKube system arrives on site

4. Typical a BioKube system is installed in 1-2 days only